Wednesday, April 13, 2011

Meter Base and Pump House

This last weekend Josh and I poured the 6x6' pad for the pump house.  Have you ever poured concrete? 

It was HARD work.
We rented a mixer and used 18 - 90 lb bags of concrete.
Josh wheeled it over and dumped it, I spread it.


The kids had fun playing in the dirt while we worked.


We talked to the electricians and the meter base has been installed and will be inspected by the state on Thursday.

As soon as the base has been inspected we can call the utility company and get them out to put in power!

No comments:

Post a Comment