Monday, April 25, 2011

Busy 10 days

A lot has happened in the last ten days.
Our electrician came out and installed the permanent meter base.  Two days later, the state inspected it.  We passed.  :)


Josh and I went out and built the pump house.


We got most of it complete.

We left the roof off so the water tank and pump could be installed.


A few days later EPUD (our power company) hooked up power to the base.


So, now we've got power!
The electricians came back and hooked up the well and construction power.


It has been POURING for the last month, with only a few small breaks in the rain.   Our pad had puddles and the trenches are full of water. 

 

We had 4 days of minimal rain, and everything sort of dried out.    Still water and mud everywhere, but no puddles on the gravel.

We met with Les from Adair at the site this morning, to make sure the site was ready and to talk about the construction process in more detail.
We're all good on the site, except there's a bit that's not quite level, so Josh and I will go out tomorrow morning and rake it level-er. (otherwise we might get a bill for extra concrete needed in the foundation)

We're getting close!!!
Les said they'd start within the week!
Thursday at the earliest, Monday at the latest!!!

It's actually happening!
WHOO HOO!!!!